Thursday 15 August 2013

Frame complete

We finally have all the frames completed and it looks awesome. All the coffered ceilings are done along with the drop down ceiling in the kitchen. All the bulkheads are done as well as the bath frames. We know how hard these guys have worked and trust me, with the system like ours, they need a medal. Because we are having roof tiles instead of colourbond, our frame had to be strengthened in order to bare the weight of the tiles. Usually if you are having tiles, you have a timber frame but we paid extra to have the strength of steel hence the longer build time.

drop down ceiling in kitchen




the connection system

master bed bi-folds and hallway window

picture windows

No comments:

Post a Comment