Wednesday, 18 September 2013

Timber, timber, timber

They finished the eaves off and put the board on the pavilion, they also installed all the timber door frames ready for the cavity doors in the theatre and ensuite. They also put in the timber surrounds for the baths



underside of the pavilion



theatre cavity doors

ens toot

end bath (1800)

main bath (1700)

inside theatre looking through to kitchen

ready for the Merbau timber battens

they ran out of board for the side of the pavilion

have I told you how much I loooovvvveee my house?

No comments:

Post a Comment