Wednesday, 31 July 2013

More walls

Next to go up were the garage walls and alfresco


meter box with 3phase power

triple car garage with external access

The alfresco (pool to the right)

Tuesday, 30 July 2013

The Meccano Set!

They stood the first lot of frames up today and we almost have a house yippee. This has been a long time coming and finally we get to see for ourselves the beginning of our 'Resort'

garages

front entry 



right side of house...courtyard

Friday, 26 July 2013

Windows

We had our windows delivered today. I've been hanging out for these babies and they're finally here woo hoo. Now just hanging to see them in I can't wait




Wednesday, 24 July 2013

Frame delivery

Frames delivered, Kordon termite barrier sprayed and hooked up to electricity...ready for take off!


right side of house where the courtyard will be, which will house the garden shed/pool equipment

my frames

check out the view behind the trees...awesome!

frames...

and more frames

Friday, 19 July 2013

Set in stone!

We now have concrete...yay
I know I wasn't support to be here (safety reasons and all) I mean it is a construction site!, but who could resist watching their home grow when they've waited sooooooo long for things to start ha?????


they started on the garage side just before I got there after taking the kids to school

towards the rear of the house now and coming up to the alfresco and master bed now

doing the alfresco area and contemplating on wether they need another load!

yep, another load was needed to finish off the master bed

ta da...complete and the boards had been taken off by the time I got back from picking the boys up from school

Thursday, 18 July 2013

Waffle on!

After having heavy showers yesterday, we finally saw our waffle pods laid and are now ready to be concreted




Saturday, 13 July 2013

Piering

The piering was done today 62 all up (tender was 60) with only having to drill 2 of the back ones deeper because of the proximity of the pool @ an extra $160 cheering!



Tuesday, 9 July 2013

Plumbing

We had the plumbing done at the site today and our electrical appointment which went very smoothly and was over in about 2 hours.



Saturday, 29 June 2013

Site Cut

With the heavens eventually opening up (we have been very lucky so far) over the last few days, we couldn't have the site cut until today. We were shocked that they decided to cut it while we had more rain predicted for the next few days but boy was it exciting to see how big the house would be and how much of the land it took up (just under half). We knew it was a big house but until you see the excavation, it's quite deceiving on paper.






gravel for the drive-way

Tuesday, 18 June 2013

....4 days to go


We now have the concrete shell started and we couldn't be happier. Mat, our supervisor has been fantastic and has been on top of the whole project, making sure we do not delay MJH from starting. 
They finished the shell in 2 days leaving just enough time to hand over the land to MJH
Thank you soooo much Mat we couldn't have wished for a better supervisor.

right side of the pool just near the plinth for my Buddha

just doing the steps in shallow end 

OMG...now that's a pool!


Tuesday, 11 June 2013

Countdown...9 days to go

With not only the countdown to build being started, I watched the weather forecast like a hawk. With every dark cloud passing by, I begged for the heavens to open up somewhere else. The gods must have heard me and we managed to get through to the next stage dry...phew
We now have a massive hole in the ground covered in steel  and supported by timber

Shallow end

My buddha will sit on the plinth above


the deep end


Wednesday, 5 June 2013

Pool construction

They started the dig and I couldn't believe how red the dirt was. Being on an old orchid has definitely been a bonus for us. We had no surprises with hitting rock, clay or water so no extra excavation was needed. With the pool being so large (8x8x4x4), it took them 2 days and 13 truck loads to finish.



Tuesday, 28 May 2013

Pool Pegout

Award pools came and pegged out the pool. It's surprising how different it looks now that they have it mapped out on the ground compared to just seeing it on paper. I'm so looking forward to watching another one being built it's fascinating.


Friday, 24 May 2013

4 little red pegs

We have 4 little red pegs sitting on our block as of this morning, and now we can get the pool started before our 20 days is up...it's gunna be tight!




Tuesday, 7 May 2013

Approved!

We have been approved...hooray and yippee onto the next step - CC

Wednesday, 27 March 2013

It's approved (the pool)

We've been approved and are now ready to start. And now we have to wait until we get the house plans approved by the developers and the water factory and then council.

Monday, 11 February 2013

The Pool

We signed the contracts for the pool today and now are looking forward to seeing it come to life as this will be constructed (concrete shell) before the build

Pool contracts

We signed the contracts for the pool